Study plans
Content is the material; a study plan is how it reaches people. Plans are what access links attach to, and what the counts in the user list are counting.
What study plans are good for
Section titled “What study plans are good for”The plan is the unit the space works with: it is what gets assigned, what access links attach to, and what the user list counts. Anyone who wants to get content to people reaches for a plan, not for an individual course.
- Every new employee has to go through the same set of training. You build one plan, put all the courses in it, and add people to it. When the next person joins, you do not assign five courses, you assign one plan.
- Safety training has to be repeated every year. On the course’s assignment inside the plan you set a recurrence interval in days. The decision is stored on the assignment, not in an HR colleague’s notes, and can be checked at any time.
- You are looking for a plan that came with a purchase. Switch to Zakoupené plány. The space has dozens of plans from the start, and this category separates bought ones from those the space wrote itself. You do not have to tell them apart by name.
- A plan is Aktivní but nobody is learning. Look at the Uživatelé
column. A plan can be active with
0people; Aktivní describes the plan, not its audience. You save yourself looking for a fault in the content.
Building a plan covers creating a plan and adding content; setting a recurrence interval covers changing recurrence.
The screen
Section titled “The screen”
- (1) Vytvořit plán starts a new one.
- (2) Five categories divide the list: all plans, E-learning, Blended Learning, the Blended Learning archive, and plans bought from elsewhere.
- (3) Each row gives the name, type, how many users it reaches, and its state.
What the categories tell you
Section titled “What the categories tell you”E-learning and Blended Learning are separate categories, and Blended Learning has an archive of its own while E-learning does not.
Zakoupené plány is a category of its own, so a plan bought from another space stays distinguishable from one this space wrote.
What to watch for
Section titled “What to watch for”The Uživatelé column reads 0 for both plans here — a plan can
exist and be Aktivní without reaching anyone. Active describes the plan, not
its audience.
Building a plan covers creating a plan and adding content. To change recurrence on an existing content assignment, follow setting a recurrence interval, including how to save and verify the setting.